Your tenders are starting to ask about carbon.
Public contracts over £5 million a year already require a Carbon Reduction Plan, and big private buyers are pushing the same demands down their supply chains. You cannot build a credible position in the two weeks you have to bid. Before the Bid shows you what to capture and how to be ready before you need it.
Carbon, tenders and how to get ready
Carbon is now a scored part of the bid
Under Procurement Policy Note 06/21, a published Carbon Reduction Plan is mandatory to bid for UK central government contracts over £5 million a year. And every large company chasing its own Net Zero target is asking its suppliers for carbon data, because your emissions are their Scope 3. The sustainability section is no longer an afterthought. It is increasingly a pass-or-fail gateway.
The guide explains what carbon reporting actually covers, the difference between Scope 1, 2 and 3, exactly what data you need to capture, and how Catalyst, using the EaaSi Carbon platform, builds and keeps your baseline current. No jargon, just a clear plan.
Download the free guide
Tell us where to send it and you will get the PDF straight away, plus a copy by email.
Your guide is ready
We have also emailed you a copy. Click below to download Before the Bid.
Download the PDFWhat’s inside the guide
Where the requirements come from: PPN 06/21, the £5m rule, and Scope 3 supply-chain pressure.
CO2e, the GHG Protocol, and what Scope 1, 2 and 3 actually mean, in plain English.
The real data sources for each scope, from gas kWh and fleet fuel to spend, waste and travel.
A credible baseline needs twelve months of data and sign-off. It cannot be built backwards.
How the same data feeds SECR, a Carbon Reduction Plan, Net Zero and the 2026 UK standards.
The full Amaris Group solution: EaaSi Carbon, Catalyst and Play it Green, end to end.
Be ready before the bid.
Download Before the Bid and see exactly what it takes to score well on carbon, before your next tender asks.